Main stages of repair in the apartment.
How to begin repair of the apartment?
The very first stage of the repair work of old apartments is the destruction and dismantling first of all of the shabby walls and partition walls, getting rid of the wall and ceiling covering. This phase is among the most "filthy" phases of the repair work.
One more amongst the most essential and "dusty" works is the window block replacement. It is necessary to do this first of all due to the fact that dirt and dust will be unallowable throughout following stages and it is restricted at all to open windows throughout painting and wallpaper works (large drops of the temperature level and wetness are unallowable). After mounting windows and windowsills it is needed to pack them instantly in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to prevent scratches).
The following stage is circuitry. Wiring can be set up in walls residential plumber Frankston or along the flooring. Electrical wiring is made inside the pipes to make sure electrical safety and boost reliability. The pipeline protects electrical wiring from external damages and permits to change the wire entirely without breaking walls and floor just by inserting the new wire instead of the old one.

House Painting follows the electrical wiring. The regular mistake during the synchronised conducting of such works happens when workers forget to set out among the cables and house painters have already plastered and smoothed out the wall. As a result, extra works are needed to seal goes after on the completed wall. The places of the feed switch and wall outlet place and their number must be thought-out in advance. The plan of power wiring is typically included into the style project.
Later on the system should be all set to service in case of failures. In addition to the electrical wirings, the telephone cable television and the television cable television are laid out. The power cable television need to not be laid out near the telephone and antenna cable televisions to avoid noise pickup and interference. The most peculiar minute is laying out the television cable television. In order to make 2 (or three) TV sets in the apartment or condo the second cable is frequently merely "strongly soldered" in parallel, so the cable television resistance is reduced. As a result, the screen quality is deteriorated, lots of programs can't be received and etc. In order to avoid such circumstance it is essential to invite a professional with special devices. He will measure the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is performed concurrently in all facilities, if it is possible. Delays are linked with the technology. Each applied layer of the plaster (or filling in ending up) should dry entirely before the work will continue.
Works in hygienic plans and the cooking area start simultaneously with home painting. It is better to meet so-called "dirty" operate in the top place and at the same time. In accordance with the plan of the hygienic professional area welding, wall chasing and pipeline run are performed. Steam radiator admissions are prepared, taps and brackets are mounted, however radiators are not installed.
Then operates in sanitary arrangements are performed according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the flooring. And at last other sanitary devices, mixers and devices are mounted.
After electrical wiring, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and set out into rosette plates. Sockets and breakers are not set up throughout this phase in order to conserve their surface appearance. The finish puttying of walls is conducted concurrently. The technically precise control of drying of the layer of the plaster (filling) is carried out by drymeter. It is an unique instrument that determines plumbing tips wetness of the material.
The following phase is the procedure of fill. Fill can be made with different products-- from typical masonry cement-sand mixture to self-aligning floorings. The advantage of the easy mix is its cheapness, the drawback is that such mix is much more difficult lined up at the level and the last dry time of such fill is 40 days, only then the next phase of the deal with flooring can be conducted, i.e. the period is too long. Self-leveling self-aligning floors are much more pricey, but more technological. Aligning takes place practically "automatically" i.e. fluid solution of mixture is put out, then it runs and you get the horizontal surface. The final dry time is 15 days i.e. you have considerable time economy. The system "warm floor" is set up into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry aligning (the fill innovation) is utilized bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are installed. Setup of doors need to take into the account thickness of future flooring covering. After installation the door can be removed its hinges and eliminated until completion of repair or packed into polyethylene film to safeguard from damages. At the same time ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile should be laid on the definitely dry overlay.
Finishing of the floor mounting depends on the planned covering. In many cases (if surface covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are repaired to the floor by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close repairing of plywood and long-lasting service of the floor without squeak and bulging. The plywood offers the extra heat- and acoustic insulation. After mounting of the plywood is ended up, wallpaper for painting can be pasted on walls.
In facilities where finish covering of the floor is laminated flooring or parquet hoard, the normal wallpapers are pasted (not for painting) in the first place. Then the flooring covering is mounted.
If finish covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned consequence is connected only with such rushing process when the excellent quantity of dust is created. In spite of the fact that excellent floor grinders are geared up with the vacuum, the adequate amount of dust is precipitated on surrounding subjects including walls. Dust is very acerbic and is terribly cleaned off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not absorb the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be thought about to be completed. It is left only to install the plinths, decorative elements, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is needed to note that the sequence of works was listed in basic and can change depending upon the definite circumstance-- the number of rooms in facility, your resources, peculiarities of the building and construction of the multilevel premises. It is based on sound judgment and everyone efficient in analysis can independently develop such a sequence.